Plumbing is one of the rough in elements of construction and is generally hidden by the finished elements such as walls floors and roofs.
Plumbing in concrete floors.
Once the concrete is out you can dig in the remaining trench to remove the sand or soil before running the new plumbing.
The plumbing trenches are typically dug at the same time as the slab footings if any.
647 784 8448 or email.
Considerations cutting through a concrete floor should be a last resort.
Plumbing drain design for concrete slab houses.
The bathroom sink s water lines are roughed in 3 inches above the drain.
Removing concrete for plumbing.
The two major plumbing codes in the united states is the ipc international plumbing code and the upc.
The center of the lav s drain is located 18 approximately above the finished floor.
When a house is to have a poured concrete slab first floor all the pipes and fittings below the floor level must be put in place before the floor is poured.
To book free estimate call.
The top openings should be packed with something to prevent concrete or debris from falling into the line.
Once the trenches are dug you can add the sewer pipes and stub outs pipes that sit above the slab floor that eventually connect the sink toilet bathtub or shower and any other drains to the system.
There are two primary methods used for removing a scored concrete floor a jackhammer and or a sledgehammer.
It can also run under sidewalks stoops patios and decks.
At this point you will no longer see the horizontal drainpipes and the main sewer line but you will see the stubs that extend vertically out of the sand.
Reasons why you should hire concrete floor installers.
Here with this video you will learn some of the basic rules of thumb for doing rough in plumbing underground.