Rivet all joints including the connection with the outlet.
Rain gutters installation rivet.
Rain gutters should be attached to the fascia and run the entire length of the roof ending with a downspout.
The vinyl material resists rusting and corrosion.
Now drill the remaining holes and install the rivets.
At the square cut end of the gutter attach a spherical end cap with aluminum pop rivets.
If the gutter doesn t turn a corner fasten an end cap to each end to do this hold the end cap in place temporarily with a single sheet metal screw then drill a 1 8 inch diameter hole and install one pop rivet above.
Join the gutter to the corner with six rivets in the locations shown.
Install two u shaped downspout brackets on the corner of the house one high and one low.
Rivets at the front of the gutter and installing the first rivet with the rivet gun.
Use a measuring tape to determine the length of the gutter.
It depends on your gutter brand s seam overlap.
Step 1 choose the right rivet material.
Slide the short length of the downspout onto the bottom of the top elbow and slide the top of the lower elbow onto the short length.
Start by drilling a 1 8 in.
Choosing the right rivets means choosing a way to help prevent damage to your gutters.
A narrow riveting area should prompt a small rivet 1 8 because you do not want to drill a large hole for a thicker rivet which could weaken the gutter material in the riveted area causing failure of the gutter material under stress.
If the gutter run measures longer than 40 feet 12 2 m it should be positioned to pitch down from the middle aimed toward a downspout at each end.
The gutter is maintenance free and cleans with a hose.
Vinyl gutter is lightweight and easy to install.
It is engineered to withstand harsh weather conditions.